BM Integrals
Contact →
← Back to projects
Project · Inca · 2026

Bathroom and guest WC renovation in a home in Inca

A bathroom with a bathtub and a WC that shared a wall. We turned them around: the main bathroom moved into the room with a window, gaining natural light and ventilation, and the old bathroom became the WC.

Main bathroom with black-framed screen, round backlit mirror and dark wood vanity unit

What we did

  • Both rooms redistributed: the main bathroom now has a window, natural light and ventilation.
  • The same large-format 60×120 cm porcelain tile on floors and walls.
  • Level-access shower tray and thermostatic taps.
  • Backlit niche in the same tile, with mitred edges.
  • Backlit mirrors and new sanitaryware.
  • Plasterboard false ceiling with recessed spotlights.
  • All-new electrics and plumbing in both bathrooms.

Project details

Type of work
Bathroom and WC renovation
Location
Inca, Mallorca
Date
June 2026

Drag the photos below to see how they looked before.

Before and after

Guest WC before the renovation Guest WC after the renovation
‹›
Guest WC · IncaJune 2026
Bathroom before the renovation Bathroom after the renovation
‹›
Bathroom · IncaJune 2026

Other projects

Commercial unit converted into a studio in IncaFull renovation of an 1840 house in IncaBathroom renovation in Palma: from bathtub to shower

Have a project in mind?

Tell us what you need.

Contact Call 608 690 130